MPS POWER Restoration

During and after a storm, MacLean Power Systems is dedicated to keeping our power infrastructure performing optimally, by supplying world class products and programs to fulfill the needs of customers who maintain electrical services to consumers worldwide.

Storm material Shipped

North West Region

North West Region

700,00 lbs

South West Region

South West Region

9 Million lbs

South East Region

South East Region

1.9 Million lbs

North East Region

North East Region

1.2 Million lbs

In the last 2 years, MacLean has shipped over 12M pounds of emergency restoration material to affected areas throughout the US.

MPs Power Restoration Video

storm Emergency Program

YELLOW STORM CODE_Tradeshow Post1 copy 2

STORM ALERT Code YELLOW

MPS将继续正常的运输/生产操作,并准备接受重大风暴订单。在可能的情况下,我们将加快开放订单,并在风暴来临之前将LTL运输给与MPS有合同的主要客户。在这种模式下,预计库存水平将足以满足风暴和正常订单,然而,有可能由于在潜在风暴区域以外的航运打开订单的材料可能会受到影响。

GREEN STORM CODE_Tradeshow Post1 copy

Storm Alert Code Green

MPS is operating under normal business conditions. A minor / isolated storm can occur with isolated outages, or a major piece of equipment/line can experience an outage where local stock is not available to restore power. Storm orders will ship with priority from available inventory or priority production as needed.

RED STORM CODE_Tradeshow Post1

Storm Alert Code Red

一场大风暴正在形成或已经发生,并造成大范围的停电。重大风暴订单正在服务中。MPS将监控风暴订单需求,并发布不影响风暴恢复的正常订单。有很大的可能性,材料由于船舶打开订单以外的风暴地区可能会受到影响。

2021 Customer Service Team

Customer Service Team

Thank you to our MPS Customer Service Team for your hard work and dedication during storm season!!

Leading manufacturer of products for electric utility and telecommunications markets

For assistance during business hours call us at 855-MPS-SHIP

Contact CUstomer Service Team

Scroll to Top